| PROJECT DESCRIPTION |
 |
| 34 Mega Watt General Electric Turbine Generator |
 |
| 65,000 square feet climate controlled warehouse |
 |
| 65,000 square feet climate controlled warehouse |
 |
| Grassroots Chemical Pilot Plant Facility |
 |
| 55,000 sq ft industrial warehouse |
 |
| Building 1 HVAC (Chiller) |
 |
| Automation of batch process plant, including installation of process trains, and instrumentation equipment building |
 |
| Convert Recovery Boiler to Gas Fired Power Boiler |
 |
| Cold Outage Coverage |
 |
| Design and construction management for the
replacement or repair of 8 shop and field erected tanks and pressure vessels. |
 |
| 7,000 sq ft administration and control room building |
 |
| Design build project for new 25,000-Gallon asphalt storage
tank and Still Yard Tank Replacement |
 |
| Engineering package of water canons installation |
 |
| Engineering and Construction Management of Ash rake drive
system and assembly |
 |
| #2 DRV Cyclone Addition |
 |
| Modify existing neutralization process for de-mineralized water facility |
 |
| Warranty and Site Engineering Support Services |
 |
| Study and Design of additional support for
unstable cable trays |
 |
| Miscellaneous plant support projects |